Plumbing
  • Identify any special plumbing needs by room. For example, roughed in plumbing for unfinished basement, etc.
  • Start the plumbing when the house is fully enclosed — the windows, doors, and roof installed.
  • If your lot has access to public sewer systems, you will need to connect to it. If not, you will be installing a septic tank system.
  • Sewer systems work with the flow of gravity — your lowest sink and drain, situated in the basement for example, must be higher than the sewer line.
  • Tubs, toilets, basins, and showers may be installed at this time.
  • A water heater may also be installed.