|
|
|
|
| Before You Build
|

|
|
Plumbing
- Identify any special plumbing needs by room. For example, roughed in plumbing for unfinished basement, etc.
- Start the plumbing when the house is fully enclosed — the windows, doors, and roof installed.
- If your lot has access to public sewer systems, you will need to connect to it. If not, you will be installing a septic tank system.
- Sewer systems work with the flow of gravity — your lowest sink and drain, situated in the basement for example, must be higher than the sewer line.
- Tubs, toilets, basins, and showers may be installed at this time.
- A water heater may also be installed.
|
|
|
|
|
|